Denver has launched a free AI-powered tool that checks building permit applications for missing items before they are submitted, the city announced on 5 November. The Denver AI permitting tool, called StartSmart: Application Intake Assistant, gives applicants an instant completeness check, with the aim of cutting the back-and-forth that can stretch the process by days. It is available online for formal site development plans and building permits, and it connects directly to the city’s online permitting portal, E-permits.
The Denver AI permitting tool was built with CivCheck, a vendor chosen through a competitive bidding process. It is one of a suite of tools developed by the Denver Permitting Office with the city agencies that support permitting and development. “This new tool reflects Denver’s commitment to turning innovation into real-world results,” said Suma Nallapati, the city’s chief AI and information officer. CivCheck first showed its capabilities at Denver’s first DenAI Summit, the country’s first city-led conference on using AI to solve social problems.
Mayor Mike Johnston said the Denver AI permitting tool would cut wait times and improve customer service. “StartSmart allows our employees to work smarter, so they can work harder for Denverites,” he said. “This tool will reduce wait times, improve customer service, and help people get answers in minutes instead of days.” Jill Jennings Golich, director of the Denver Permitting Office, said the tool “has the ability to flag missing information for our customers before they submit.”
How Denver AI permitting checks an application
The check runs in four steps, and only the second uses AI. The applicant creates a free account on CivCheck’s Denver portal, using the same email as the E-permits account, and uploads the plan set and forms as PDFs. The AI then reads the plan sheets and forms and pulls out dimensions, labels and required data fields. The extracted data runs through fixed rules the city wrote for that project type. Each flag carries an explanation and a citation to the requirement behind it, and the applicant either fixes the document or explains the item. The tool then writes a pre-screening report, watermarks the checked documents and creates the E-permits record, where the applicant finishes and submits.
Denver says the rule checks in the Denver AI permitting system are deterministic, meaning the same sheet gets the same pass or fail every time, and the rules do not change with use. Uploaded documents are not used to train AI models. The tool covers first submissions only. Reviewer corrections and resubmittals stay in E-permits. Eligible applications include building permits for commercial, multifamily, single-unit, two-unit, accessory dwelling unit and industrial work, as well as residential interior remodels and formal site development plans.
Denver AI permitting targets a slow first review
The Denver AI permitting tool is aimed at a familiar problem. Only about 30% of Denver permits clear their first-round review, according to CBS News, and the average approval time for a major residential project is 160 days. When an application is not ready, city staff ask the applicant to resubmit, and that exchange can last days. StartSmart moves the completeness check to the applicant’s side, before the city receives anything, so that staff spend less time chasing missing paperwork and more time on plan review.
The city council voted in March to approve a five-year Denver AI permitting contract worth about $4.6 million, to cut the backlog. A city official said the goal is to raise the first-round acceptance rate to 80%. The lone dissenting vote, council member Flor Alvidrez, raised concerns about the accuracy of AI systems and said local architects and developers had told her the technology may not be ready to handle the complexity of zoning codes and site-specific conditions.
What Denver AI permitting does not do
The Denver AI permitting tool does not replace intake or plan review approvals by city staff, who still make the final decision on whether an application is ready for plan review and whether a project is approved for permits. A clean report is not a clean permit. In a Seattle test of the CivCheck tool on 29 past residential applications, it caught 48 of 55 reasons staff had given for rejecting packages at intake, or 87%, but it missed seven and did not catch 35 issues outside its scope. Denver says more application types will be added in 2027.

